Thanks, Mamooon.
In BRM we haven’t defined a path or a workflow. I’m talking about the risk analysis step (not the approval phase in BRM). So we cannot set as mandatory the risks analysis at stage level. Our requirement is set the mandatory analysis in step ”risk analysis” into Business Role Methodology capability.
Any ideas?